Contracts executed in 2015

Hamburger Hungaria Ltd., Hungary

Delivery of the cooling tower CTF 100/III with stainless steel sheating,  including design, manufacturing, delivery and assembly supervision.

HAMBURGER5

DANIELI CZECH ENGINEERING, a.s., Czech Republic

Manufacturing and delivery of 18 pcs. of the cooling tower BORA 2400 for two cooling circuits.

Obrzek3

GAS NATURAL FENOSA GENERACION, S.L.U., Spain

Supply of a cooling system with the capacity of 1050 m3 and supervision of the assembly in a cooling tower with natural interson draught and gross capacity of 700 MW, flow rate of 36,355 t/h, tower height of 115, bottom diameter 76 m, top diameter 46 m.

Central Termica Meirama5

HEP PROIZVODNJA d.o.o., Croatia

Delivery, supervising and mounting of hybrid cooling tower for thermal plant TE-TO Osijek.

OSIJEKA3

U.S.STEEL Košice, s.r.o., Slovakia

General repair of the 10-cell concrete forced draft cooling tower, used for cooling blast furnaces. The overhaul for the Slovak customer includes a complete replacement of technology, construction works and wiring. As part of the repair work we deliver our low-speed engines.

GESTUM Capital s.r.o., Czech Republic

Supply of a test and experimental station for Buštěhrad Science and Technology Park.

Gestum kapitala6

EKOKEM OY AB, Finland

Supply of 5pcs. dry coolers (27 MW) and 2 pcs. dry coolers (11 MW), including supervision.

FINSKOCABERO7